Preferred Alternative Design
Sodom and Shearer Dam Removal-Hydraulic Modeling Report, RDG, April 2011
Sodom Dam Removal Designs, RDG, December 2010
Shearer Dam Removal Designs, RDG, December 2010
Biological Assessment for the Removal of Sodom-Shearer Dams
RDG 75% Sodom Design Presentation & 25% Shearer Design Presentatation (PDF, 4MB)
RDG 50% Design Plans (PDF, 23MB)
RDG Presentation on 25% Sodom Dam Restoration Design
- Engineered Large Wood A
- Engineered Large Wood B
- Engineered Large Wood C
- Reinforced Earth Bank Treatment
- Engineered Riffle
- Channel Layout 20-30
- Channel Layout 30-40
- Channel Layout 40-50
- Design Cross Section 20-28
- Design Cross Section 29-37
- Design Cross Section 38-46
- Design Cross Section 47-50
RDG Technical Memo on Grade Control Structures
RDG Presentation on Proposed Combined Alternative October 14, 2009
Design Process & Technical Reports (November 2008-September 2009)